Hi all,

in SC, we can run 3 simultaneous jobs. What about SC4.0 ?

in an environment histing many customers & lots of VM, it would be great if we could run a lot more jobs in the same time

thanks

Re: SnapCreator simultaneous jobs

Hi, we have the same problem. Since our environment uses snapcretaor for Oracle and VMware from the same server and we want to be able running more jobs simultaneously. Did you get a solution on this?

Michael

Re: SnapCreator simultaneous jobs

Hi

I think the answer I got was something like:

- the number of simultaneous jobs is not going to be dramatically increased (5 max?)

- if several jobs need to be managed in the same time, some will go to the queue until available slots

br,

Re: SnapCreator simultaneous jobs

Thanks for the quick reply

michael