Active IQ Unified Manager Discussions

Prot Man and Vfiler SV relationships

stepheno
4,601 Views

Hello,

I am trying to import an existing snapvault relationship into Protection manager 3.8.  The relationship is on the same single storage controller. The source is from the physical server (vfiler0) to the destination on the vfiler (vfiler1).

This relationship works if done manually, but does not appear in external relationships in PM.  If I attempt to add the relationship in PM, it will create a new SV relationship, but it will be from vfiler0 to vfiler0.

I need to have the relationship read (like when you do a snapvault status) vfiler0 as source and vfiler1 as destination.  this is because of a snapcreator dependancy.  SnapCreator will not instruct PM to update a vault if the snapvault status does not show as "source".  when the relationship is from and to the same controller (vfiler0 to vffiler0) it will show as "snapvaulted"

Anyone encountered this or know of a way to get PM to import an existing relationship like this?

Thanks

10 REPLIES 10
Public