<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Exchange 2010 SME 6.X/7.X Add 3rd NODE two working 2 NODE SME DAG HOW? in Data Protection</title>
    <link>https://community.netapp.com/t5/Data-Protection/Exchange-2010-SME-6-X-7-X-Add-3rd-NODE-two-working-2-NODE-SME-DAG-HOW/m-p/121417#M10941</link>
    <description>&lt;P&gt;QUESTION: Should we make the NEW Server a NEW third member of the DAG BEFORE or AFTER the integration of SME and MOVE from temporary local storage to Netapp LUN's&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Exchange 2010 SP3, RU14&lt;/P&gt;&lt;P&gt;SME6.X or SME 7.2&lt;/P&gt;&lt;P&gt;SRV 2008R2 SP1&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;How it is and is running now: We have a existing working and SME running 2-NODE Dag&amp;nbsp;&lt;/P&gt;&lt;P&gt;Netapp: SME is running on the other two NOES&amp;nbsp;and we want to add another NODE&lt;/P&gt;&lt;P&gt;Target: We want to add another NODE to the DAG.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;* The NEW 3rd node DAG&amp;nbsp;SRV2008R2 with Exchange 2010 SP3 RU14 is setup and Interfaces LAN and DAG are correct&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Now with SME we had to MOVE/MIGRATE from &lt;span class="lia-unicode-emoji" title=":anguished_face:"&gt;😧&lt;/span&gt; to the real LUNS&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;Question:&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;* Should we make the NEW Server a member of the DAG BEFORE or AFTER the integration of SME and MOVE from temporary local storage to Netapp LUN's&lt;/P&gt;&lt;P&gt;* I don't remember how we did that the last time&lt;/P&gt;&lt;P&gt;* I remember that in the DAG all DRIVES and PATHS have to be exact the SAME so how can we do this then?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;2ND Question&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If LUNS are all there SHOULD we make the MDB's DIRECT on the STORAGE. This realted to ECMP1649948.pdf page 19. Evene if we have to RUN the Migration wizard then.&lt;/P&gt;&lt;P&gt;CAN this be the identical PATH in the FIELD FROM and TO in below screenshots then?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;SnapManager® 7.1 for Microsoft® Exchange Server, Installation and Setup Guide&lt;/P&gt;&lt;P&gt;ECMP1649948.pdf page 19&lt;/P&gt;&lt;P&gt;-----------------------------------------------------------------------------------------------------------------------------&lt;/P&gt;&lt;P&gt;Migrating databases and configuring SnapManager for Exchange servers&lt;/P&gt;&lt;P&gt;Before you can back up your databases using SnapManager, you need to run the SnapManager&lt;/P&gt;&lt;P&gt;Configuration wizard for each Exchange server. You use the Configuration wizard to migrate&lt;/P&gt;&lt;P&gt;databases to NetApp storage and to configure SnapManager for your Exchange servers.&lt;/P&gt;&lt;P&gt;About this task&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;&lt;FONT color="#ff0000"&gt;&lt;STRONG&gt;Even if you create new databases directly on NetApp storage, you need to run the Configuration&lt;/STRONG&gt;&lt;/FONT&gt;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;&lt;FONT color="#ff0000"&gt;&lt;STRONG&gt;wizard to create a mapping between those databases and the SnapInfo directory.&lt;/STRONG&gt;&lt;/FONT&gt;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;-----------------------------------------------------------------------------------------------------------------------------&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Greetings from Switzerland&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;This shows how we did old the two FIRST NODES before ANY Productive Data was on the Exchange a few years ago.&lt;/P&gt;&lt;P&gt;Both MDB and the LOCAL database + TS LOGS where first PUT on the &lt;span class="lia-unicode-emoji" title=":anguished_face:"&gt;😧&lt;/span&gt; Drives of both DAG than migrated to the LUN with SME.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I can't do that with a NEW add node. Because the PATHS will be different TO the running existing setup....&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper" image-alt="Way we setup the FIRST TWO NODES" style="width: 538px;"&gt;&lt;img src="https://community.netapp.com/t5/image/serverpage/image-id/5630i26B92D1A01B2FD82/image-size/large?v=v2&amp;amp;px=999" role="button" title="Way we setup the FIRST TWO NODES" alt="Way we setup the FIRST TWO NODES" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Existing DBS's and paths FINALL version with 2 NODES&lt;/P&gt;&lt;P&gt;[&lt;span class="lia-inline-image-display-wrapper" image-alt="2016-07-18 17-07-16.jpg" style="width: 748px;"&gt;&lt;img src="https://community.netapp.com/t5/image/serverpage/image-id/5631iE68A0E1FA5EBC369/image-size/large?v=v2&amp;amp;px=999" role="button" title="2016-07-18 17-07-16.jpg" alt="2016-07-18 17-07-16.jpg" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Wed, 04 Jun 2025 19:54:48 GMT</pubDate>
    <dc:creator>bretzeli</dc:creator>
    <dc:date>2025-06-04T19:54:48Z</dc:date>
    <item>
      <title>Exchange 2010 SME 6.X/7.X Add 3rd NODE two working 2 NODE SME DAG HOW?</title>
      <link>https://community.netapp.com/t5/Data-Protection/Exchange-2010-SME-6-X-7-X-Add-3rd-NODE-two-working-2-NODE-SME-DAG-HOW/m-p/121417#M10941</link>
      <description>&lt;P&gt;QUESTION: Should we make the NEW Server a NEW third member of the DAG BEFORE or AFTER the integration of SME and MOVE from temporary local storage to Netapp LUN's&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Exchange 2010 SP3, RU14&lt;/P&gt;&lt;P&gt;SME6.X or SME 7.2&lt;/P&gt;&lt;P&gt;SRV 2008R2 SP1&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;How it is and is running now: We have a existing working and SME running 2-NODE Dag&amp;nbsp;&lt;/P&gt;&lt;P&gt;Netapp: SME is running on the other two NOES&amp;nbsp;and we want to add another NODE&lt;/P&gt;&lt;P&gt;Target: We want to add another NODE to the DAG.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;* The NEW 3rd node DAG&amp;nbsp;SRV2008R2 with Exchange 2010 SP3 RU14 is setup and Interfaces LAN and DAG are correct&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Now with SME we had to MOVE/MIGRATE from &lt;span class="lia-unicode-emoji" title=":anguished_face:"&gt;😧&lt;/span&gt; to the real LUNS&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;Question:&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;* Should we make the NEW Server a member of the DAG BEFORE or AFTER the integration of SME and MOVE from temporary local storage to Netapp LUN's&lt;/P&gt;&lt;P&gt;* I don't remember how we did that the last time&lt;/P&gt;&lt;P&gt;* I remember that in the DAG all DRIVES and PATHS have to be exact the SAME so how can we do this then?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;STRONG&gt;2ND Question&lt;/STRONG&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;If LUNS are all there SHOULD we make the MDB's DIRECT on the STORAGE. This realted to ECMP1649948.pdf page 19. Evene if we have to RUN the Migration wizard then.&lt;/P&gt;&lt;P&gt;CAN this be the identical PATH in the FIELD FROM and TO in below screenshots then?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;SnapManager® 7.1 for Microsoft® Exchange Server, Installation and Setup Guide&lt;/P&gt;&lt;P&gt;ECMP1649948.pdf page 19&lt;/P&gt;&lt;P&gt;-----------------------------------------------------------------------------------------------------------------------------&lt;/P&gt;&lt;P&gt;Migrating databases and configuring SnapManager for Exchange servers&lt;/P&gt;&lt;P&gt;Before you can back up your databases using SnapManager, you need to run the SnapManager&lt;/P&gt;&lt;P&gt;Configuration wizard for each Exchange server. You use the Configuration wizard to migrate&lt;/P&gt;&lt;P&gt;databases to NetApp storage and to configure SnapManager for your Exchange servers.&lt;/P&gt;&lt;P&gt;About this task&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;&lt;FONT color="#ff0000"&gt;&lt;STRONG&gt;Even if you create new databases directly on NetApp storage, you need to run the Configuration&lt;/STRONG&gt;&lt;/FONT&gt;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;&lt;EM&gt;&lt;FONT color="#ff0000"&gt;&lt;STRONG&gt;wizard to create a mapping between those databases and the SnapInfo directory.&lt;/STRONG&gt;&lt;/FONT&gt;&lt;/EM&gt;&lt;/P&gt;&lt;P&gt;-----------------------------------------------------------------------------------------------------------------------------&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Greetings from Switzerland&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;This shows how we did old the two FIRST NODES before ANY Productive Data was on the Exchange a few years ago.&lt;/P&gt;&lt;P&gt;Both MDB and the LOCAL database + TS LOGS where first PUT on the &lt;span class="lia-unicode-emoji" title=":anguished_face:"&gt;😧&lt;/span&gt; Drives of both DAG than migrated to the LUN with SME.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I can't do that with a NEW add node. Because the PATHS will be different TO the running existing setup....&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&lt;span class="lia-inline-image-display-wrapper" image-alt="Way we setup the FIRST TWO NODES" style="width: 538px;"&gt;&lt;img src="https://community.netapp.com/t5/image/serverpage/image-id/5630i26B92D1A01B2FD82/image-size/large?v=v2&amp;amp;px=999" role="button" title="Way we setup the FIRST TWO NODES" alt="Way we setup the FIRST TWO NODES" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Existing DBS's and paths FINALL version with 2 NODES&lt;/P&gt;&lt;P&gt;[&lt;span class="lia-inline-image-display-wrapper" image-alt="2016-07-18 17-07-16.jpg" style="width: 748px;"&gt;&lt;img src="https://community.netapp.com/t5/image/serverpage/image-id/5631iE68A0E1FA5EBC369/image-size/large?v=v2&amp;amp;px=999" role="button" title="2016-07-18 17-07-16.jpg" alt="2016-07-18 17-07-16.jpg" /&gt;&lt;/span&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 04 Jun 2025 19:54:48 GMT</pubDate>
      <guid>https://community.netapp.com/t5/Data-Protection/Exchange-2010-SME-6-X-7-X-Add-3rd-NODE-two-working-2-NODE-SME-DAG-HOW/m-p/121417#M10941</guid>
      <dc:creator>bretzeli</dc:creator>
      <dc:date>2025-06-04T19:54:48Z</dc:date>
    </item>
  </channel>
</rss>

