<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Process of switching equipment on and off in ONTAP Discussions</title>
    <link>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455652#M44048</link>
    <description>&lt;P&gt;hello&amp;nbsp;&lt;/P&gt;&lt;P&gt;Here is what needs to be done. Switch on the power of disk shelves, and power up the controllers. Details can be found in the link.&lt;/P&gt;&lt;P&gt;&lt;A href="https://kb-cn.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_power_up_all_ONTAP_nodes_in_a_cluster_following_a_graceful_shutdown#" target="_blank"&gt;https://kb-cn.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_power_up_all_ONTAP_nodes_in_a_cluster_following_a_graceful_shutdown#&lt;/A&gt;&lt;/P&gt;</description>
    <pubDate>Wed, 09 Oct 2024 05:35:06 GMT</pubDate>
    <dc:creator>liu</dc:creator>
    <dc:date>2024-10-09T05:35:06Z</dc:date>
    <item>
      <title>Process of switching equipment on and off</title>
      <link>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455483#M44017</link>
      <description>&lt;P&gt;Assume that the equipment room is to be constructed, and all the equipment (servers. Switches. Storage) are shut down and shut down, some of which have vmware running on them. Can you give me a shutdown and startup process sequence?&amp;nbsp;&lt;/P&gt;&lt;P&gt;Prevents data loss and other hardware problems.&lt;/P&gt;</description>
      <pubDate>Mon, 30 Sep 2024 03:41:28 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455483#M44017</guid>
      <dc:creator>wareer</dc:creator>
      <dc:date>2024-09-30T03:41:28Z</dc:date>
    </item>
    <item>
      <title>Re: Process of switching equipment on and off</title>
      <link>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455521#M44023</link>
      <description>&lt;P&gt;If you have two sites then you can storage vMotion to the surviving site and shutdown ESX/servers&amp;nbsp; then&amp;nbsp; storage and then switches. If not power-off VMs, ESX then storage and switches. This how I did two months ago for DC move (in metro environment).&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Otherwise (single site)&lt;/P&gt;&lt;P&gt;Power off VMs&lt;/P&gt;&lt;P&gt;Power off ESX/Servers&lt;/P&gt;&lt;P&gt;Power off STorage and switches.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Power up them in reverse order (switches and storage first).&lt;/P&gt;</description>
      <pubDate>Tue, 01 Oct 2024 01:22:27 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455521#M44023</guid>
      <dc:creator>Sanaman</dc:creator>
      <dc:date>2024-10-01T01:22:27Z</dc:date>
    </item>
    <item>
      <title>Re: Process of switching equipment on and off</title>
      <link>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455525#M44025</link>
      <description>&lt;P&gt;From a NetApp perspective, we cover multiple power off/on activities at&amp;nbsp;&lt;A href="https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/What_is_the_procedure_for_graceful_shutdown_and_power_up_of_a_storage_system_during_scheduled_power_outage" target="_blank" rel="noopener"&gt;Gracefully shutdown and power up your storage system Resolution Guide - NetApp Knowledge Base&lt;/A&gt;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;In particular, for ONTAP systems:&amp;nbsp;&lt;A href="https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_perform_graceful_shutdown_and_power_up_of_all_ONTAP_nodes_in_a_cluster" target="_blank"&gt;How to perform graceful shutdown and power up of all ONTAP nodes in a cluster - NetApp Knowledge Base&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Tue, 01 Oct 2024 06:36:24 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455525#M44025</guid>
      <dc:creator>Amador</dc:creator>
      <dc:date>2024-10-01T06:36:24Z</dc:date>
    </item>
    <item>
      <title>Re: Process of switching equipment on and off</title>
      <link>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455652#M44048</link>
      <description>&lt;P&gt;hello&amp;nbsp;&lt;/P&gt;&lt;P&gt;Here is what needs to be done. Switch on the power of disk shelves, and power up the controllers. Details can be found in the link.&lt;/P&gt;&lt;P&gt;&lt;A href="https://kb-cn.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_power_up_all_ONTAP_nodes_in_a_cluster_following_a_graceful_shutdown#" target="_blank"&gt;https://kb-cn.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_power_up_all_ONTAP_nodes_in_a_cluster_following_a_graceful_shutdown#&lt;/A&gt;&lt;/P&gt;</description>
      <pubDate>Wed, 09 Oct 2024 05:35:06 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Discussions/Process-of-switching-equipment-on-and-off/m-p/455652#M44048</guid>
      <dc:creator>liu</dc:creator>
      <dc:date>2024-10-09T05:35:06Z</dc:date>
    </item>
  </channel>
</rss>

