<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic E2760 console procedure in EF &amp; E-Series, SANtricity, and Related Plug-ins</title>
    <link>https://community.netapp.com/t5/EF-E-Series-SANtricity-and-Related-Plug-ins/E2760-console-procedure/m-p/435401#M1214</link>
    <description>&lt;P&gt;Hello all,&amp;nbsp;&lt;BR /&gt;Sorry for the basic question, Currently My Netapp 2 controllers are in Lockdown mode (Booting limit exceeded)&lt;BR /&gt;I`d like to connect via console cable and clear the lockdown but couldn`t find the command list from this site.&amp;nbsp;&lt;/P&gt;&lt;P&gt;Console cable connection only gives me the information or can I operate it?&lt;/P&gt;&lt;P&gt;I managed to connect it by Putty but lost from here.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
    <pubDate>Wed, 04 Jun 2025 10:00:15 GMT</pubDate>
    <dc:creator>Heesun</dc:creator>
    <dc:date>2025-06-04T10:00:15Z</dc:date>
    <item>
      <title>E2760 console procedure</title>
      <link>https://community.netapp.com/t5/EF-E-Series-SANtricity-and-Related-Plug-ins/E2760-console-procedure/m-p/435401#M1214</link>
      <description>&lt;P&gt;Hello all,&amp;nbsp;&lt;BR /&gt;Sorry for the basic question, Currently My Netapp 2 controllers are in Lockdown mode (Booting limit exceeded)&lt;BR /&gt;I`d like to connect via console cable and clear the lockdown but couldn`t find the command list from this site.&amp;nbsp;&lt;/P&gt;&lt;P&gt;Console cable connection only gives me the information or can I operate it?&lt;/P&gt;&lt;P&gt;I managed to connect it by Putty but lost from here.&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Wed, 04 Jun 2025 10:00:15 GMT</pubDate>
      <guid>https://community.netapp.com/t5/EF-E-Series-SANtricity-and-Related-Plug-ins/E2760-console-procedure/m-p/435401#M1214</guid>
      <dc:creator>Heesun</dc:creator>
      <dc:date>2025-06-04T10:00:15Z</dc:date>
    </item>
    <item>
      <title>Re: E2760 console procedure</title>
      <link>https://community.netapp.com/t5/EF-E-Series-SANtricity-and-Related-Plug-ins/E2760-console-procedure/m-p/435407#M1215</link>
      <description>&lt;P&gt;Hi Heesun,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;A "booting limit exceeded" lock down indicates the controller rebooted 5 times in a row without completing its normal/complete boot up process. This type of lock down often suggests there is a firmware or software related issue preventing the firmware from loading completely before hitting some exception.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;You may clear the lock down with the following commands but there is a high likelihood that the controllers will reboot again and lock down. The console output would be very helpful here once the controllers' boot up again and encounter the exception.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;UL&gt;&lt;LI&gt;clearHardwareLockdown&lt;/LI&gt;&lt;LI&gt;lemClearLockdown&lt;/LI&gt;&lt;/UL&gt;&lt;P&gt;Note: You need to run the commands in the order provided. Additionally, the second command will reboot the controller which is expected.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;</description>
      <pubDate>Mon, 30 May 2022 13:05:36 GMT</pubDate>
      <guid>https://community.netapp.com/t5/EF-E-Series-SANtricity-and-Related-Plug-ins/E2760-console-procedure/m-p/435407#M1215</guid>
      <dc:creator>ahmadm</dc:creator>
      <dc:date>2022-05-30T13:05:36Z</dc:date>
    </item>
  </channel>
</rss>

