<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Moving FAS2020 to new power source in ONTAP Hardware</title>
    <link>https://community.netapp.com/t5/ONTAP-Hardware/Moving-FAS2020-to-new-power-source/m-p/48311#M3393</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;This should work without issue.&amp;nbsp; Should is a big word here, you still want a change control if you require them as Murphy will take the moment you pull the first PSU to strike and have the second PSU fail.&amp;nbsp; This is highly unlikely, but there would be the potential as there is a small surge in draw when going from dual PSUs to a single.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;run "environment status chassis" to make sure both PSUs are in "OK" status before the move&lt;/P&gt;&lt;P&gt;move the first PSU, run "environment status chassis" after, again ensure both PSUs are "OK"&lt;/P&gt;&lt;P&gt;I would play it very safe here, move PSU 1, wait 5 mins, then move PSU2(no reason other than to make sure the levels all had a chance to level and adjust.)&lt;/P&gt;&lt;P&gt;move the second PSU, run "environment status chassis" and again verify "OK" status&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;-Scott&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Thu, 20 Jun 2013 19:04:12 GMT</pubDate>
    <dc:creator>cscott</dc:creator>
    <dc:date>2013-06-20T19:04:12Z</dc:date>
    <item>
      <title>Moving FAS2020 to new power source</title>
      <link>https://community.netapp.com/t5/ONTAP-Hardware/Moving-FAS2020-to-new-power-source/m-p/48307#M3392</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Newbie here,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I have a cluster with 2 production dual-head Netapp FAS2020 which I need to move the power cables to a new power source.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;The FAS2020s each have 2 power supplies. I was thinking of just unplugging the power cord from one power supply at a time and plugging it in to the new power source. Then, doing the same to the other power cord from the other power supply. Theoretically I would think that it shouldnt interrupt service in any way. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Would this work or are there any procedures to be followed before i do this?&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 05 Jun 2025 06:00:11 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Hardware/Moving-FAS2020-to-new-power-source/m-p/48307#M3392</guid>
      <dc:creator>RCHAUDRY1750</dc:creator>
      <dc:date>2025-06-05T06:00:11Z</dc:date>
    </item>
    <item>
      <title>Re: Moving FAS2020 to new power source</title>
      <link>https://community.netapp.com/t5/ONTAP-Hardware/Moving-FAS2020-to-new-power-source/m-p/48311#M3393</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;This should work without issue.&amp;nbsp; Should is a big word here, you still want a change control if you require them as Murphy will take the moment you pull the first PSU to strike and have the second PSU fail.&amp;nbsp; This is highly unlikely, but there would be the potential as there is a small surge in draw when going from dual PSUs to a single.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;run "environment status chassis" to make sure both PSUs are in "OK" status before the move&lt;/P&gt;&lt;P&gt;move the first PSU, run "environment status chassis" after, again ensure both PSUs are "OK"&lt;/P&gt;&lt;P&gt;I would play it very safe here, move PSU 1, wait 5 mins, then move PSU2(no reason other than to make sure the levels all had a chance to level and adjust.)&lt;/P&gt;&lt;P&gt;move the second PSU, run "environment status chassis" and again verify "OK" status&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;-Scott&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 20 Jun 2013 19:04:12 GMT</pubDate>
      <guid>https://community.netapp.com/t5/ONTAP-Hardware/Moving-FAS2020-to-new-power-source/m-p/48311#M3393</guid>
      <dc:creator>cscott</dc:creator>
      <dc:date>2013-06-20T19:04:12Z</dc:date>
    </item>
  </channel>
</rss>

