<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Metrocluster  IP Switchover scenarios in AFF</title>
    <link>https://community.netapp.com/t5/AFF/Metrocluster-IP-Switchover-scenarios/m-p/462072#M1424</link>
    <description>&lt;P&gt;Hi all!&lt;/P&gt;&lt;P&gt;Reviewing the scenarios where a metrocluster can initiate an automatic switchover. I have a question.&lt;BR /&gt;In the event that the 2 controllers of an MCC in a Data Center perform an orderly shutdown for example by a power outage and both remain in the loader.&lt;/P&gt;&lt;P&gt;In the case of an orderly shutdown, is a switchover to the other Data Center performed?&lt;/P&gt;</description>
    <pubDate>Wed, 16 Jul 2025 17:30:36 GMT</pubDate>
    <dc:creator>Kiko</dc:creator>
    <dc:date>2025-07-16T17:30:36Z</dc:date>
    <item>
      <title>Metrocluster  IP Switchover scenarios</title>
      <link>https://community.netapp.com/t5/AFF/Metrocluster-IP-Switchover-scenarios/m-p/462072#M1424</link>
      <description>&lt;P&gt;Hi all!&lt;/P&gt;&lt;P&gt;Reviewing the scenarios where a metrocluster can initiate an automatic switchover. I have a question.&lt;BR /&gt;In the event that the 2 controllers of an MCC in a Data Center perform an orderly shutdown for example by a power outage and both remain in the loader.&lt;/P&gt;&lt;P&gt;In the case of an orderly shutdown, is a switchover to the other Data Center performed?&lt;/P&gt;</description>
      <pubDate>Wed, 16 Jul 2025 17:30:36 GMT</pubDate>
      <guid>https://community.netapp.com/t5/AFF/Metrocluster-IP-Switchover-scenarios/m-p/462072#M1424</guid>
      <dc:creator>Kiko</dc:creator>
      <dc:date>2025-07-16T17:30:36Z</dc:date>
    </item>
    <item>
      <title>Re: Metrocluster  IP Switchover scenarios</title>
      <link>https://community.netapp.com/t5/AFF/Metrocluster-IP-Switchover-scenarios/m-p/462079#M1425</link>
      <description>&lt;P&gt;hello:&lt;/P&gt;&lt;P&gt;For disaster recovery testing or planned site maintenance, a MetroCluster switchover can be performed to transfer control to the disaster recovery (DR) site (Site A). Before initiating this process, at least one surviving site node must be in a normal operating state prior to the switchover. If a previous switchover operation on some nodes at the DR site failed, the operation can be retried on all these nodes.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Best regards.&lt;/P&gt;</description>
      <pubDate>Thu, 17 Jul 2025 03:11:55 GMT</pubDate>
      <guid>https://community.netapp.com/t5/AFF/Metrocluster-IP-Switchover-scenarios/m-p/462079#M1425</guid>
      <dc:creator>chenguanghui</dc:creator>
      <dc:date>2025-07-17T03:11:55Z</dc:date>
    </item>
  </channel>
</rss>

