Thats the thing, how do i "edit" the job? When i go into "Backup Builder" and then select the job (daily backup) under the plan viewer, it does not show the new databases as something I can select. If I go to create a backup job from scratch, it will show me the new databases as a selection.
This is what it looks like when i go through the motions of creating a new backup job from scratch. The items i'm pointing out are the new databases.

In the existing DAILY backup job, when i browse down, I do not see the 3 databases as options.

Do I need to do a "farm resync" to get the new databases to show up while I'm looking at the existing backup job?
Hope this makes sense..