Thanks a lot. Thinking about a combo between DR and backup functionality:
- Creation local snaps on primary site retention 2 days.
- QBSM to 2nd site with different retention e.g. 31 days.
- Snapshots on 2nd site can be used for ndmp backup or cloning for nonproduction usage (test / sandbox / quality )......
This configuration was created several times specially in a SAP environment with Oracle / DB2 and ASE databases.
Until now I had to create several configs to do that so a QBSM integration will help a lot.
Additionally a scheduler with more functionally in terms of chains (pre/post job) will help to configure such processes more easier. I know scheduler is not a full blown job scheduler like other products, but a little bit pre and post will help .
Thanks
Harald