Hi all,
in SC, we can run 3 simultaneous jobs. What about SC4.0 ?
in an environment histing many customers & lots of VM, it would be great if we could run a lot more jobs in the same time
thanks
Hi, we have the same problem. Since our environment uses snapcretaor for Oracle and VMware from the same server and we want to be able running more jobs simultaneously. Did you get a solution on this?
Michael
Hi
I think the answer I got was something like:
- the number of simultaneous jobs is not going to be dramatically increased (5 max?)
- if several jobs need to be managed in the same time, some will go to the queue until available slots
br,
Thanks for the quick reply
michael