We have a FAS2554 at our DR site. When we test our DR and failover our prod site to the DR site we observe almost constant disk utilization being close to 100% and CPU close to 100%. We are contemplating adding more disk shelves, creating a new agg and spreading the load between all aggs. I have also heard that there is an option to "swap the head" on the 2554 for a more robust controller with a faster CPU. Is this possible and if so -- what are the options for an upgrade.
Thank you.
sergei