Data Backup and Recovery

SnapCenter 1.1 - VSC 6.2P2 attaching virtual disk failed

frischlimalte

Hi together,

 

Problem: Attaching virtual disk stays at 50%  VSC attach.jpg

 

Environment:

Ontap 9.0RC1

VSC 6.2P2

SnapCenter 1.1

vCenter 6.0U2

SVM (6 volumes): NFS 

 

What we´ve done:

DomainUser with full rights in SnapCenter and vcenter, assign this user to VSC Backup role on the  which was created by using rbac.

Added the VSC-host in SnapCenter --> SnapCenter automatically added the SVM connection and detects the policies.

 

Backup is running fine, only attaching fails.

 

What could be the problem?

 

Thanks!

4 REPLIES 4

neerajd

can i know if flexclone is getting through or not? 

 

if flexclone is through and it fails to attach the vmdk to the virtual machine you can check the VSC logs. 

 

if possiable can you share VSC logs mainly "aegis".

 

thanks

 

Jeff_Yao

any logs from snapcreator to show which step it's sticking on?

frischlimalte

Hi yaoguang,

 

Jeff_Yao

oops, sorry about that. yea, any logs from filer side or vsc?

Announcements
NetApp on Discord Image

We're on Discord, are you?

Live Chat, Watch Parties, and More!

Explore Banner

Meet Explore, NetApp’s digital sales platform

Engage digitally throughout the sales process, from product discovery to configuration, and handle all your post-purchase needs.

NetApp Insights to Action
I2A Banner
Public