hello:
For disaster recovery testing or planned site maintenance, a MetroCluster switchover can be performed to transfer control to the disaster recovery (DR) site (Site A). Before initiating this process, at least one surviving site node must be in a normal operating state prior to the switchover. If a previous switchover operation on some nodes at the DR site failed, the operation can be retried on all these nodes.
Best regards.