Data Backup and Recovery

Snap Creator 4.1.1 and scheduled snapvault updates

Truyen_Vo
2,079 Views

Hi,

We have Snap Creator 4.1.1 (Server on Windows 2008 R2, Clients on RHEL 6.5). The Oracle database has many NetApp volumes on multiple controllers. Our secondary is a 2 controller HA (FAS3240).  At backup times, we are noticing that the number of snapvault updates and the target secondary controllers are not quite optimal, not exactly what we would have liked. This increases backup time. For examples, 2 snapvault updates on the same 2nd controller, while there's nothing on the other.

 

My question is is there a way we can control the way Snap Creator scheduling snapvault update jobs ?

Thanks and regards.

 

0 REPLIES 0
Public