SAS adapter in FAS3270?

bjornzakrisson
4,192 Views

Feeling like a newbie

Having a Q about adding a SAS adapter in FAS3270 controllers.

Q:

When i halt the system (controller A, first CF takeover of course)

Can i just pull out the "motherboard"? Is it hot swappable? And install the SAS adapter in A controller? Start the system. CF giveback. Let system start. Do a CF takeover and do the same for controller B?

Why i ask i s when i halt i became unsure because in controller A the fans are still on and all the green diods are lightning.

Regards

Bjorn

4 REPLIES 4

AGUMADAVALLI
4,193 Views

Once the takeover is performed, please verify the access of NFS, CIFS and LUNS of failed over node. Login with RLM or SP to verify the status of the failed over node.

Just switch off the node which is halted and replace the necessary components.

Once everything is ready just power it and you should be good to go.

thank you,

AK G

bjornzakrisson
4,193 Views

How can i switch of a 3270 controller without any power off button?

I have 2 power supplies but they feed the 2 controllers

Skickat från min vita Iphone4

4 sep 2012 kl. 16:52 skrev "AGUMADAVALLI" <xdl-communities@communities.netapp.com<mailto:xdl-communities@communities.netapp.com>>:

<https://communities.netapp.com/index.jspa>

Re: SAS adapter in FAS3270?

created by AGUMADAVALLI<https://communities.netapp.com/people/AGUMADAVALLI> in Storage Systems - View the full discussion<https://communities.netapp.com/message/89925#89925>

Once the takeover is performed, please verify the access of NFS, CIFS and LUNS of failed over node. Login with RLM or SP to verify the status of the failed over node.

Just switch off the node which is halted and replace the necessary components.

Once everything is ready just power it and you should be good to go.

thank you,

AK G

Reply to this message by replying to this email -or- go to the message on NetApp Community<https://communities.netapp.com/message/89925#89925>

Start a new discussion in Storage Systems by email<mailto:discussions-community-products_and_solutions-storage_systems@communities.netapp.com> or at NetApp Community<https://communities.netapp.com/choose-container.jspa?contentType=1&containerType=14&container=2878>

aborzenkov
4,193 Views

Controller is hot pluggable. Wait after “Waiting for giveback” after “cf takeover”, then break with ^C and halt. Now you can pull out controller.

saranraj456
4,192 Views

halt will power down the controller then do the replacement.