My customer is asking if they can utilize the Ops Mgr Backup Manager feature to report existing SnapVault relationships. The current setup utilizes the "snapvault snap sched" option to kick off daily snapshots. If we discover these relatinoships into the Backup Manager product, from what I have read, i think we will need to disable the 'snapvault snap sched' and let Ops Mgr do the scheduling. Can someone confirm if I have my facts straight? Is it possible to import existing relationships without making any changes to the SnapVault relationships themselves?
Also, I was under the impression that Backup Manager and Disaster Recovery tabs would be removed in a future release and replaced by Protection Manager functionality. Can someone confirm if these features are going to stick around? I would like to dissuade the customer from going this route in favor of using Protection Manager since it looks like the majority of our development efforts are focused on it.
Thanks for your help.