No it doesnt look like that is working as expected if you seeing long lag times.
Do you see the same on the Source side?
If not then it looks like your schedules are either incorrect on the destination side or there are no schedules.
There needs to a backup job on the source side and a transfer job on the destination side. I would recommend that the transfer job runs the same time/day as the backup job so when it does a snapshot on source, it also then transfers the snap over to the destination filer
You could run it manually by selecting the job and clicking update to force an update.