Hi all, I have inherited a stretched 7-mode metrocluster: using Brocade FC switches, 2 fabics, 2 ISLs.
I need to change the DWDM provider so just wondered if anyone has any advice / gotchas when moving
DWDM links?
My plan so far is to disable HA/CF, then replace the link 1 fabric at a time.
thanks Rob