Hi all, I have inherited a stretched 7-mode metrocluster: using Brocade FC switches, 2 fabics, 2 ISLs.

 

I need to change the DWDM provider so just wondered if anyone has any advice / gotchas when moving

DWDM links?

 

My plan so far is to disable HA/CF, then replace the link 1 fabric at a time.

 

thanks Rob

  

1 ACCEPTED SOLUTION

aborzenkov
2,393 Views
To avoid confusion - you have fabric metrocluster; stretch metrocluster does not use switches.

There is no need to disable cf. Just reconnect one link and when verified that new link is OK reconnect second link. This way you won't lose redundancy (cluster can work with just a single link). As usual, it makes sense to do it off peak.

View solution in original post

1 REPLY 1

aborzenkov
2,394 Views
To avoid confusion - you have fabric metrocluster; stretch metrocluster does not use switches.

There is no need to disable cf. Just reconnect one link and when verified that new link is OK reconnect second link. This way you won't lose redundancy (cluster can work with just a single link). As usual, it makes sense to do it off peak.