Reading the documentation, it says that I need to do a shutdown of the filers to remove the shelf. Is there any way to avoid this shutdown? Would doing a cf takeover and cf giveback work? My plan is to :

  1. Do a takeover from controller A
  2. remove the cable from B to the shelf
  3. do a giveback on A
  4. do a takeover from B
  5. remove the cable from A to the shelf
  6. do a giveback on B

Thank you.

1 ACCEPTED SOLUTION

YEKYAWTHARMYINT
5,146 Views

Hi

It won't work and it will lead your filer to panic mode or it will reboot by itself. because of multiple disks missing from the controller. The safe way to do it without downtime is, remove ownership from all the disk belong to the shelf that you want to remove, power off the shelf and remove the cable.

1) destroy the volume and aggregate (if necessary)

2) remove ownership

3) make sure all the disks belong to the shelf that you want to remove are unowned disks (disk show -n)

4) power off the shelf that you want to remove

5) remove the cable

Regards,

Ye

View solution in original post

5 REPLIES 5

YEKYAWTHARMYINT
5,147 Views

Hi

It won't work and it will lead your filer to panic mode or it will reboot by itself. because of multiple disks missing from the controller. The safe way to do it without downtime is, remove ownership from all the disk belong to the shelf that you want to remove, power off the shelf and remove the cable.

1) destroy the volume and aggregate (if necessary)

2) remove ownership

3) make sure all the disks belong to the shelf that you want to remove are unowned disks (disk show -n)

4) power off the shelf that you want to remove

5) remove the cable

Regards,

Ye

LBERREISFCU
5,146 Views

Hi Ye, thank you very much. This is exactly what I was hoping to do. I have destroyed the volume and aggregate as well as removed ownership of all disks on the shelf. I will try this tonight and hope I do not get the filer to panic.

LBERREISFCU
5,146 Views

I did not do this exactly as stated as I wanted to experiment a bit. I am confident that it would have worked as well. The way that I did this was to do a cf takeover from A, removed the cable from B while it was booting up, did a cf giveback, then did the same on the other controller.

BALAJI_VENKATRAMAN
5,146 Views

Just a CF takeover and giveback wont work - as the cabling to your shelf which has to be removed - will still be valid from the partner head and will continue serving data(I am assuming Mulitpathing is implemented in your case which is Netapp best practice).

If you do a TO and then power off the shelf - the disks will go missing from the partner (which is accessing it though MP)and filer will panic.

You should shutdown the filer and then remove the shelf.

Balaji

LBERREISFCU
5,146 Views

Hi Balaji,

Thank you, this is also useful. Hopefully, by removing ownership of the disks, I will avoid a panic and be able to do this without doing a shutdown.

- Louie