The NetApp Community is moving to a new platform and is in Read-Only mode. Click to learn more.
Stay connected during the transition - Join our Discord community today.

ONTAP Hardware

can I hot-add DS4246 shelf to a existing FAS2720 with a DS212C shelf

Daniel_66
138 Views

Hello,

      as per this document(https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/How_to_cable_an_IOM12E_platform_with_IOM6_and_IOM12_storage_shelves_in_Multi-Path_HA ), FAS2720 with embedded shelf need meet strict rule when using a mix IOM6 & IOM12 stack. The above document only states that a new cabling installation is permitted. Is it possible to hot-add a DS4246 to FAS2720 with a DS212C in a stack?(refer to the cabling figure below) I didn't find the document about. Please advise, thanks a lot.

 

cabling.png

 

 

1 ACCEPTED SOLUTION

Daniel_66
115 Views

I tested the above cabling method, It is supported to hot-add a DS4246 to a existing DS212C stack on FAS2720

hot-adding shelf.png

https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/Can_I_add_an_IOM6_at_the_end_of_a_mixed_stack_of_IOM6_and_IOM12

View solution in original post

2 REPLIES 2

Daniel_66
116 Views

I tested the above cabling method, It is supported to hot-add a DS4246 to a existing DS212C stack on FAS2720

hot-adding shelf.png

https://kb.netapp.com/on-prem/ontap/OHW/OHW-KBs/Can_I_add_an_IOM6_at_the_end_of_a_mixed_stack_of_IOM6_and_IOM12

andris
113 Views

Just be mindful that ONTAP support for all SAS2 (IOM6-based) shelves is removed starting with ONTAP 9.16.1.

Public