Hi,
There is a requirement to prefix or suffix date stamp on the attached report name. I know we can do that within report, but can't think of a way to use that function outside report studio.
The report is developed and scheduled.
For eg report name is "Storage Utilization", but when user receive that in his/her inbox then he/she see the attachment as "Storage Utilization 2017-02-28". And when same report run on 1st March then it should be "Storage Utilization 2017-03-01"
Note: I need that on attached report, not in subject line of mail
Thanks